Fig.
9 -‐
I nstall
S tay-‐Put
P lug
H older
p rovided
Mark
h oles
f or
p osition.
•
Use
9 /64"
d rill
•
Screw
i nto
p lace
w ith
s crews
s upplied
•
Automatic
O peration
1. During
a
s way
e vent,
t he
S way
M aster™
w ill
a utomatically
a ctivate
t he
t railer
b rakes
t o
counteract
t he
s way,
b ringing
t he
t railer
b ack
t o
c enterline.
2. The
u nit
i ndicator
l ight
w ill
i lluminate
w hile
t he
u nit
i s
p lugged
i n
a nd
c onfirm
t he
c onnection
and
r eadiness.
Troubleshooting
To
v erify
t he
S way
M aster
i s
p roperly
i nstalled,
f ollow
t hese
s teps:
A.
Ensure
t hat
a ll
a dapters
a re
p lugged
i nto
a ppropriate
s ocket
c orrectly.
B.
Ensure
t he
n ormal
b rake
l ights
a nd
i ndicator
l ights
f unction
c orrectly.
C.
Ensure
t hat
y our
b rake
c ontroller
i s
w orking
p roperly
a nd
i ndicates
t he
t railer
i s
c onnected.
D.
Ensure
t he
S way
M aster™
u nit
i ndicator
l ight,
s hown
i n
F ig.
8 ,
i s
i lluminated
c ontinuously.
Operation
M anual
Page
5