Maintenance; Replace The Guide Bar And The Chain - GreenWorks CS24L00 Manual Del Operador

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

39
38
When the log is on a slope:
1. Stand on the uphill side.
2. Control the chainsaw completely.
3. Hold the chainsaw handles tightly.
4. Release the cutting pressure near the end of the cut.
When bucking is complete (38):
1. Wait for the chain to stop (39).
2. Ensure the chainsaw is turned off.
3. Check for hazards before you move to another tree.
10

MAINTENANCE

CAUTION
Do not let brake fluids, gasoline, petroleum-based materials
touch the plastic parts. Chemicals can cause damage to the
plastic, and make the plastic unserviceable.
CAUTION
Do not use strong solvents or detergents on the plastic
housing or components.
WARNING
Remove the battery pack from the machine before
maintenance.
10.1
REPLACE THE GUIDE BAR AND
THE CHAIN
1. Loosen the chain cover by turning the chain tension knob
counterclockwise.
English
2. Remove the chain cover.
3. Put the chain drive links (21) into the bar groove (20).
4. Put the chain cutters (22) in the direction of the chain
operation.
5. Put the chain in position and make sure that the loop is
behind the guide bar.
6. Hold the chain and bar.
7. Put the chain loop around the sprocket (17).
8. Make sure the chain tension pin hole (19) on the guide
bar fits correctly with the bolt (16).
9. Install the chain cover.
10. Tighten the chain. Refer to Adjust the chain tension.
11. Tighten the chain cover knob when the chain is correctly
tensioned.
If you start the chainsaw with a new chain, do a test run for
2-3 minutes. A new chain gets longer after the first use,
examine the tension and tighten the chain if necessary.
11
22
21
20
17
16
19
NOTE
EN
Tabla de contenido
loading

Este manual también es adecuado para:

Csg401

Tabla de contenido