Zoeller QWIK JON ULTIMA 202 Instrucciones De Instalación página 7

Ocultar thumbs Ver también para QWIK JON ULTIMA 202:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

STEP 4
1)
Position the pump unit a minimum of 1/8" from the
wall with the inlet facing forward. Attach the bellows
to the inlet using the worm drive clamp provided.
2)
Place the toilet in front of pump unit aligning the
discharge of the toilet with the inlet of the pump
unit. Make sure that the bellows will bridge the gap
adequately for final installation. The toilet tank should
be a minimum of 1/2" from the wall.
14-3/8
20
STEP 5
1)
Installing the grinder unit behind a wall will require
an extension kit (P/N 10-2123) sold separately.
2)
Place the toilet assembly a minimum of 1/2" from
the wall and mark the closet bolt locations on the
floor.
3)
Measure the appropriate length of 3½" Schedule 40
PVC pipe provided with the extension kit and cut it
to length. See sketch at right.
4)
Set toilet aside.
Toilet assembly is top heavy. Take special
precautions to ensure that toilet does not tip over and
break.
Rough-in (stand alone installation)
31-1/2
Rough-in (behind the wall installation)
© Copyright 2012 Zoeller Co. All rights reserved.
3)
Lightly mark the locations of the pump unit, toilet
and closet bolt locations on the floor. Lightly mark
the wall with the height of the pump unit and the
bottom and sides of the toilet tank to ensure against
interference from pipe runs later.
4)
Remove the toilet from the pump unit and set it
aside.
17-1/2
SK2592
7
SK2590
SK2634
Tabla de contenido
loading

Tabla de contenido