4.11 Attaching the Dosing Line to the Dosing Pump

Fitting
Gasket
PFA tube
16
Bühler Technologies GmbH
Now insert the modified
cover with PTFE tube in
the canister opening and
secure. Be sure the tubes
are as straight as pos-
sible in the container.
This ensures the con-
tainer can be emptied
the best.
This concludes the base
unit assembly.
Please remove the fol-
lowing components in-
cluded in delivery:
• Carton labelled pack-
age 2
Package 2: PFA tube 1.6
mm (3 m), fitting (1x),
thrust ring (1x)
The PFA tube length can
be trimmed as necessary.
Then start the individual
assembly steps.
Remove the PFA tube (3
m) from the resealable
bag (package 2) and at-
Flange
tach the gasket and fit-
ting.
Now insert the fitting
with the thrust ring and
flange in the connection
of the dosing pump (see
figure/connection with
arrow down). Secure the
fitting by screwing it into
the screed connection.
4.12 Connecting the Dosing Pump and Type 1 Heat
Exchanger with DN 4/6 Gas Inlet
Reducer
PTFE tube
Acid inlet
T-piece
Reducer
Gas inlet
PFA tube
Please remove the fol-
lowing components in-
cluded in delivery:
• Resealable bag la-
belled package 4
• Resealable bag la-
belled package 4.1 (in
package 4)
Package 4: Fitting (1x), O-
ring (2x), reducer
DN 4/6 – 1.6 mm (1x), T-
adapter DN 4/6 (1x), PTFE
tube DN 4/6 (0.05 m) (2x)
Please note, on the op-
tional US version the re-
sealable bag is labelled
package 5! The connec-
tions are then 1/6"-1/4"
instead of DN 4/6!
Then start the individual
assembly steps.
Connect the first PTFE
tube (package 4) to the
hose nipple DN 4/6 of the
reducer (package 4).
Then connect the first
Acid outlet
PTFE tube to the T-piece
DN 4/6 (package 4).
Next, connect the second
PTFE tube DN 4/6 (pack-
age 4) to the T-piece
DN 4/6.
Now first attach the fit-
ting, then the two O-
rings (package 4) over the
open end of the tube
coming from the dosing
pump outlet.
Attach the components
O-ring
far enough onto the tube
so they will not fall off
when lifted (see figure).
BX450031 ◦ 08/2020
Tabla de contenido
loading

Tabla de contenido