3.
Commissioning and recomming
3.1
Transport
The delivery condition of the pump is packed on a pallet and IPPC wood in
foil. The maximum net weight per pump amounts about 200 kg.
WARNING!
Incorrect handling of the pump during transport.
Pump damage by incorrect handling. Personal injury through falling and/ or tilting
load.
• Note the emphasis and the maximum weight of the load.
• Use appropriate slings.
• Take the provided attachment points.
3.2
Attachment points
Attach lifting accessories e.g. lifting straps, slings or chains. These can also
be combined depending on the situation an taking into account the correct
application.
3.3
Installation
The position of the pump is aligned over the piping, important is that the
screw connection of the casing not be tightened. The location of the pump is
aligned with a bubble level. After alignment, the positions have to be marked
and drilled. Depending on the charateristics of the site suitable fasteners shall
be chosen.
Chapter: Commissioning and recomming
Transport
3-1