3. install Shelves
A.
Shelf placement can be adjusted if necessary to either predrilled locations
or any location using Drop-In Nuts (N) Shelf Peg assembly (see diagram below).
B. Place shelves on pegs.
C. Install accessories (IR Repeater Kit, Power Conditioner, etc) and place components.
A
Drop-In Nut Option
Should you desire shelf placement in location other than
predrilled locations, use the drop-in nut option.
This option allows shelf to be placed at any height.
B
Assemble loosely as shown.
Salamander 4 Bay Cabinet with XL Display Mount
B
N
Insert into post channel
O
and slide to desired height.
Level shelf by adjusting
shelf peg positions and
tighten screw using hex key.
Note: Drop-in nut must
make a 1/4 turn in post.
7 of 28
501-020 [9.17]