Home Depot GLACIER BAY 5318WWHD Guía De Uso Y Cuidado página 15

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

[Heading goes here]
Installation (continued)
9
Attaching the cabinet to the wall
NOTE: Before cutting, drilling, or hammering into any wall
surface, verify the location of electrical, plumbing, and gas
lines. Cutting any of these may cause serious injury.
□ Mount the hanging rail (E) onto the wall cleat (F) and mark
the location on wall through the mounting holes.
□ Drill holes in the marked spots on the wall. Note, if the
mounting screws (OO) will not be going directly into studs,
insert the wall anchors (PP).
□ Mount the hanging rail (E) onto the wall cleat (F) and attach
to the wall, using the mounting screws (OO), as shown.
hanging rail (E)
wall
wall cleat (F)
OO
hanging rail (E)
wall cleat (F)
15
Please contact 1-855-HD-GLACIER for further assistance.
PP
HOMEDEPOT.COM/GLACIERBAY

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Glacier bay 5318gyhd1004 101 7241004 101 708

Tabla de contenido