GE AGL05 Manual Del Propietario E Instrucciones De Instalación página 12

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

INSTALL THE TOP
4
MOUNTING RAIL AND THE
SIDE ACCORDION PANELS
Install the top mounting rail with 3 Type B
A
screws from the outside of the case.
B
Slide the left and right accordion panels
into the top and bottom mounting rails.
Attach the accordion panels to the case
C
using 4 Type B screws on each side.
Accordion
panel
Type B
screws
Installation Instructions
Type B
screws
Top mounting rail
BACK
Bottom mounting rail
INSTALL THE AIR CONDITIONER
5
IN THE WINDOW
A
Center the air conditioner in the window
with the bottom mounting rail between
the window stool and the support brackets.
Top mounting rail
Bottom
mounting
rail
Close the window. Make sure the window
B
sash is behind the top mounting rail of
the air conditioner. It should be level or
slightly tilted to the outside. Use a level;
about 1/3 bubble will be the correct case
slant to the outside.
Type A
screw
Type C
screw
Extend the accordion panels to fill the
C
window opening and use 2 Type A screws
to secure the top corners and 2 Type C
screws to secure the bottom corners.
12
Window
1/3 bubble
Support brackets
Type A
screw
Type C
screw

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Agn05Agq05Ags05Agv05

Tabla de contenido