Manual Control; Wiring Diagrams; Remote Control - Champion MARQUIS WC 35 Manual Del Usario

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Winter Shut Down
• Drain water. Always drain all of the water out of the cooler and
water supply line when not in use for prolonged periods, and par-
ticularly at the end of the season. Keep the water line disconnected
from both the unit and water supply so that it does not freeze.
• Cover unit. To protect the life of the finish, a cover for the unit is
suggested in extended periods of non use.
• Cover grill. To help keep out cold air you can use the optional
plastic grill cover. This cover may be purchased from your local
distributor. To install the cover, line up the grill cover with the grill
so that the tabs on the cover will slide over the center section of the
grill. Slide the grill cover onto the grill. The tabs will snap into
place. To remove, just pull the grill cover straight forward away
from the grill.
• Unplug unit from power supply during extended periods of
non-use.
By following the operating, installation, and maintenance suggestions
as outlined, you can get many years of efficient and satisfactory
service from your cooler. In the event additional information is desired,
your dealer will be more than glad to assist you in every possible
way.
Vertical Duct Conversion
This window unit can be reconfigured to a vertical tunnel configura-
tion for installation into smaller width openings. Follow the
subsequent steps if this is desired.
1. Remove the 9 screws
from the sides and bot-
tom of the tunnel.
2. Remove the top 4
middle screws of the
top pan while holding
the tunnel in place (Fig
10). Be careful not to
drop the tunnel or
damage to the electric
cords could occur. You
may need to loosen
other screws in the top
pan to make it easier to remove the tunnel.
3. Rotate the tunnel 90 degrees counter-clockwise (Fig 11). Be
careful as you rotate the tunnel that you don't damage or discon-

Manual Control

Blower Motor
Black
Hi
Red
Low
Green
Gnd
White
Com.
Pump
Motor
4
Remove top
screws last. Do
Not Drop Tunnel
Fig. 10

Wiring Diagrams

Plug
Switch
nect the cords which are still con-
nected to the controls and the
front panel.
4. Insert the flange of the tunnel
between the front panel and the
top pan. Line up the two larger
holes in the tunnel with the cen-
ter two holes of the top pan. (Fig
12).
5. Using the screws taken from the
top pan, secure the tunnel to the
unit. Do not tighten the screws,
leave them loose until the
rest of the tunnel has been
secured.
6. Line up the three holes at
the bottom of the tunnel
with the holes in the front
panel. Using the screws
taken from the bottom of
the tunnel previously, se-
cure the tunnel to the front
panel.
7. Make sure all the screws
removed from the top pan
are in place and tighten all
screws.
8. Remove the three screws (2 in
model (R)WC35) from each side
of the front panel as shown in fig-
ure 13.
CAUTION: Make
sure that you do not remove the
bottom most screw. It holds the
blower housing in place.
9. In the installation kit there are two
strips of metal that will cover the
gap in the front panel. Line up the
holes in the metal strips to the
holes in the front panel and secure
them with the screws previously removed in step 8. (See Fig.
13) Install the metal strips so that there is no gap between the
top pan and the metal strip. If there is a gap, turn the metal strip
around.
NOTE: When mounting a cooler with this type of vertical
tunnel configuration, the unit should be supported by a flat
support or stand. The installation method mentioned in the
owner's manual using chains and legs should not be used. The
filler panels in the installation kit may be used to seal off the
window above the cooler duct.

Remote Control

Ground
Blower Motor
LockPlate
w/ Grommet
Black
Hi
Red
Low
Green
Gnd
White
Com.
Pump
Motor
Fig. 11
Line up to the two
middle holes
Fig. 12
Metal
Strip
Do Not Remove
Bottom Screw
Fig. 13
Control
Ground
Screw
Wire
110496-1
Tabla de contenido
loading

Tabla de contenido