LG CEILING CASSETTE Manual De Instalación página 13

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

5
Fit the corner covers.
6
Open two screws of control panel cover.
Screw
7
Connect one display connector and two
vane control connectors of front panel to
indoor unit PCB.
The position marking on PCB is as:
Display connector : CN_DISPLAY
Vane control connector: CN_VANE 1,2
CN_VANE 1,2
8
Close the cover for control box.
INSTALLATION OF DECORATIVE PANEL(ACCESSORY)
CN_DISPLAY
9
Install the air inlet grille and Filter on the
panel.
- After inserting the edge of the grill into
the panel body, close the door lock and
press on the left, right, and center
sections.
Installing the grill link on the panel body
Inserting the edge into the panel body
Closing the door lock
Check the left, right and central sections
Tabla de contenido
loading

Tabla de contenido