FAUCET INSTALLATION
STEP 1 – INSTALLING THE FAUCET
Shut off the water supply.
1
Cut an adequate opening in the wall
for the dimensions of the product
2
base, and the corrugated tube.
3
Dismantle the faucet base.
Drill 4 small holes for the product
base support and drive the anchors
4
in.
14
QUADRAT DPB / DPE
FAUCET INSTALLATION
Mount the product base to the
opening cut in the wall, and secure
5
the base support to the two small
holes using 2 screws. Make sure that
the base is leveled to the center.
IMPORTANT: The product base should be
installed so that the outside surface of the
finished wall falls between the minimum and
maximum lines marked at the base.
Assemble the temporary protective
6
product base cover.
Make sure the corrugated tube will
7
protrude out of the wall when tiling.
QUADRAT DPB / DPE
MAX
MIN
15