Drilling The Piping, Condensation Hose And Cable Feed-Through - Qlima SC52 B Serie Manual De Instalación

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 24
SC 4232 / SC 5232
SC 4248 / SC 5248 / SCJA 4819
6.2

Drilling the piping, condensation hose and cable feed-through.

a.
Determine the positions of the holes according to the diagram detailed in Fig. 9. Drill one (1) hole
slanting slightly downwards to outdoor side, this will prevent water to come indoors (fig 10).
b.
Always use wall hole conduit when drilling metal grid, metal plate or the like.
4
78
78
Wall
Outdoor
Indoor
≥5°
Figure 10
Tabla de contenido
loading

Tabla de contenido