Test Running After Installation - Qlima SC52 B Serie Manual De Instalación

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 24
11. CHECK FOR COOLANT LEAKAGE
G
TAKE CARE
Evacuating the coolant piping and the interior unit of the air conditioner must be carried out
in accordance with the applicable national regulations. The test for coolant leakage of the
coolant piping and the interior unit may only be carried out by a certified fitter.
POSSIBILITIES FOR LEAK CHECK AIR CONDITIONER
Soap water method: Apply a soap water or a liquid neutral detergent on the indoor unit connection
or outdoor unit connections by a soft brush to check for leakage of the connecting points of the
piping. If bubbles come out, the pipes have leakage.
Dedicated special leak detector: Use the leak detector to check for leakage.

12. TEST RUNNING AFTER INSTALLATION

Perform test running after completing electrical safety check and gas leak check.
The test running time should last more than 30 minutes.
Check if all the functions works well during test running. Especially check whether the drainage of indoor
unit is smooth or not.
4
88
Tabla de contenido
loading

Tabla de contenido