Kohler K-20199 Guía De Instalación Y Cuidado página 6

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

3. Secure the Bridge Cabinet
Make sure the bridge cabinet is tight against the vanity.
Using a 1/4" drill bit, drill two pilot holes through the back rail
and the finished wall. Verify the pilot holes are positioned to
ensure the lag bolts will engage the 2x6 backing material.
Using a 1/8" drill bit, drill two pilot holes through the side of the
bridge cabinet and into the vanity.
Secure the bridge cabinet to the finished wall with two 5/16" lag
bolts and washers (not provided).
Secure the bridge cabinet to the vanity using two #8 x 1-1/2"
panhead screws (provided). Use shims as needed to make the
bridge cabinet level and flush with the vanity.
For Installation to Two Vanities
Install the second vanity according to the instructions packed
with the vanity. Ensure the vanity is flush against the front of the
bridge cabinet before securing the vanity to the wall.
Using a 1/8" drill bit, drill two pilot holes through the side of the
bridge cabinet and into the second vanity.
Secure the bridge cabinet to the second vanity using two #8 x
1-1/2" panhead screws (provided).
1304473-2-A
6
Kohler Co.
Tabla de contenido
loading

Tabla de contenido