Rockwell Automation Allen-Bradley PanelView 550 Instrucciones De Instalación página 10

Terminales de pantalla táctil
Ocultar thumbs Ver también para Allen-Bradley PanelView 550:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

8
PanelView 550/600 Touch Screen Terminals
4. Install the 4 self-locking nuts, hand tight.
Protective
Installation
Label
PV600 shown, PV550 similar
5. Alternately tighten the self-locking nuts until the terminal is held firmly
against the panel. Tighten the nuts to a torque of 10 inch-pounds. Do not
overtighten nuts.
!
6. Remove the protective installation label covering the top vents of the
terminal.
!
41061-109-01(B)
ATTENTION: Mounting nuts must be tightened to a torque of 10
inch-pounds to provide a proper seal and to prevent potential damage to
the terminal. Allen-Bradley assumes no responsibility for water or
chemical damage to the terminal or other equipment within the
enclosure because of improper installation.
ATTENTION: Failure to remove the protective installation label
covering the top vents could result in overheating and damage to the
terminal.
Self-Locking Nuts
(4 used, 8 provided)
Mounting Studs
(2 left / 2 right)
Tabla de contenido
loading

Este manual también es adecuado para:

Allen-bradley panelview 600

Tabla de contenido