VAN STORAGE SOLUTIONS
FOR THE WAY YOU WORK
ATTENTION: PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS AND WARNINGS
BEFORE ASSEMBLING, INSTALLING OR USING THIS PRODUCT.
PLAN YOUR VAN (TIPS FOR FASTER INSTALLATION)
•
Installing your WEATHER GUARD
•
Before cutting or drilling in the floor, verify the location of you gas tank, fuel lines and electrical
cables so you don't accidentally cut something important.
•
Make sure that the blind fasteners go directly into the sheet-metal floor and not through a floor
mat. Cut clearance holes for fasteners and spacers. Always wear eye protection when drilling
or cutting.
•
Your WEATHER GUARD
96901-3-01. If you think you might want to change to it in the future, put an extra nut between
the driver's side panel and the center panel to allow enough space.
•
Mount the upper corners of the bulkhead as close to the van inside walls as possible for a
sturdy and quiet installation.
DESCRIPTION
1/4-20 Blind Fasteners
1/4-20 x 5/8" Hex Head Bolts
1/4-14 x 3/4" Self-Drilling Screws
1/4-20 Nylon Lock Nuts
1/4-20 x 1-1/4" Hex Head Bolts
1/4" Flat Washers
Floor Mounting Spacers
Blind Fastener Installation Tool
1/4-20 x 2-1/4" Hex Head Black Bolt
1/8" x 1" x 4" Foam Pads
*24-0306*
TM
®
Bulkhead can be up-graded with a swing-door conversion kit,
®
BOLT KIT
QTY.
25
23
INSTALLATION MANUAL
Model Number 96101-3-01
WWW.WEATHERGUARD.COM
Bulkhead is very clear cut following these instructions.
Approximate installation time: 60 minutes
per unit depending on van equipment
6
installation experience.
4
•
•
•
4
•
•
7
•
•
5
•
•
1
•
•
1
•
2
1
BULKHEAD
INSTALLATION TIME
TOOLS REQUIRED
Electric Drill
1" Hole Saw
5/16" Nut Driver Bit
Pencil or Marker
Hammer
Center Punch
Drill Bits: 1/8", 5/16", 13/32"
3/8" Ratchet Drive
Sockets: 5/16", 7/16"
Level
Carpenter's Square
Open End Wrenches: 7/16", 9/16"
Part No. 24-0306 REV. D ECN 5282 03/13