Zwilling ENFINIGY 53102 Manual De Instrucciones página 24

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 50
Operation
Operation
1
Putting the kettle into operation
Rinse the water container with clear, warm water before
using it for the first time. Unwind the connection cable com-
pletely and guide it through the opening on the base. Set the
water container onto the base and press the on/off button
on the control panel for 3 seconds.
1.
2
Filling the water
Lift the water container at its handle from the base and pull off the lid in order to fill in water.
There is a measuring scale for cups and litres on the inside. Place the lid back onto the water
container after filling.
Observe the MAX
marking for the maximum
water volume. Do not
overfill.
23
2.
2.
1.
2
14
11
3.
4.
3.
L
1.7
MAX
GB
Tabla de contenido
loading

Tabla de contenido