Rapporto Di Installazione - Ravaglioli RAV1131 Traducción De Las Instrucciones Originales

Ocultar thumbs Ver también para RAV1131:
Tabla de contenido
Sollevatore modello
Lift model
Hebebühne Modell
• Verifi ca della tensione di alimentazione _______________________________________________________________
Power voltage check
Kontrolle Stand Tragmutterverschleiss
• Interruttore generale ___________________________________________________________________________________
Main switch
Hauptschalter
• Comando salita e discesa ______________________________________________________________________________
Up/down control
Steuerung Heben und Senken
• Corretto senso di rotazione del motore ________________________________________________________________
Correct direction of motor rotation
Richtige Drehrichtung des Motors
• Controllo funzionamento valvola taratura centralina e piombatura ___________________________________
Control unit setting valve operation and seal inspection
Kontrolle Funktionstüchtigkeit Eichventil Schaltschrank und Lotung
• Controllo funzionamento elettrovalvola discesa _______________________________________________________
Downward movement solenoid valve inspection
Kontrolle Funktionstüchtigkeit Absenkelektroventil
• Controllo coppia di serraggio delle viti di fi ssaggio Guide al telaio ____________________________________
Tightening torque inspection of guide/frame retention screws
Kontrolle Anzugsmoment der Befestigungsschrauben Führungen am Rahmen
• Controllo corretto scorrimento dei bracci di presa _____________________________________________________
Correct clamp arm sliding inspection
Kontrolle einwandfreie Gleitung Aufnahmearme
• Controllo corretto inserimento e sgancio degli arresti __________________________________________________
Correct arm stop engagement and release control
Kontrolle einwandfreies Ein- und Ausklinken der Armarretierungen
• Controllo livello olio centralina _________________________________________________________________________
Control unit oil level check
Kontrolle Schaltschrank-Ölstand
• Controllo lubrifi cazione delle guide di scorrimento ____________________________________________________
Slide guide lubrication control
Kontrolle Schmierung der Gleitführungen
• Controllo del funzionamento del cicalino antischiacciamento __________________________________________
Check operation of the crush-protection buzzer.
Funktionskontrolle des Quetschschutzsummers
• Controllo della presenza e collocazione degli adesivi __________________________________________________
Adhesive and adhesive position check
Kontrolle Vorhandensein und Anbringung der Kleber
• Portata - Carrying capacity - Tragfähigkeit __________________________________________________________________
• Avvertenze - Warnings - Hinweise _________________________________________________________________________
• Matricola - Serial number - Serie-Nr. ________________________________________________________________________
Firma e timbro dell'installatore
Fitterís signature and stamp - Unterschrift und Stempel des Monteurs
76

RAPPORTO DI INSTALLAZIONE

INSTALLATION REPORT - INSTALLATIONSBERICHT
DA COMPILARE A CURA DELL'INSTALLATORE
TO BE COMPLETED BY THE FITTER - DURCH DEN MONTEUR AUSZUFÜLLEN
Operazione di controllo
Control operation - Kontrolloperation
Installation date - Datum der Installatiom
0495-M001-1
matr.
serial number
Serie-Nr.
Data di installazione
13
Tabla de contenido
loading

Este manual también es adecuado para:

Rav1132Rav1150uRav1150umbRav1155k

Tabla de contenido