Unlocking for manual operation:
A Insert the key in the lock (1) and turn it towards the
hinges of the gate.
B Pull on the release lever (2), making it turn 90º. The
arm (3) is unlocked from the base (4).
C Move the gate manually.
10
D189A
Assembly positions and levels
A: 60mm minimum (distance
from rotation shaft to pillar)
B: 56mm (distance from the
floor to the lower part of
the gate)
C: 152mm (height of the box)
D: approximately
(height
bottom)
M189A
Drainage bottom: stones
a n d
g r a v e l
u n d e r n e a t h t h e b o x t o
facilitate drainage and prevent
the box from becoming filled
with water.
1
Orifice for electrical ducts.
2
Orifice for drainage ducts.
1
2
M189B
Unlocking
Motorised operation locking:
A Turn the release lever (1) until it is located
underneath the base (2).
B Turn the key as shown in the figure.
C Move the gate until the base (2) is aligned with the
arm (3).
20mm
from
drainage
p o s i t i o n e d
• The P pivot should be vertical and
• The lower hinge (2) must be eliminated.
• Install pipes to drain off the water
1
2
3
aligned with the upper hinge (1).
(3), which must be downward sloping.
Check that drainage is correct.
B
D189B
P
P189C
M189C