Aquatic 1363BFSD Manual De Instalación página 3

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

INSTALLATION PROCEDURE, CONT.
3
If mounting fittings — from stable reference points (back wall studs, floor)
measure the locations of spout and valves. Note measurements.
5
Place the unit directly on level floor (or on top of foundation materials) with
drain fitting over and onto waste pipe with threshold firmly on the floor.
Assure waste pipe protrudes well into drain fitting. Maintain proper floor
slope towards drain.
7
Cover the entire bottom of the unit with a piece of cardboard or other
protective material. Pre-drill pilot holes and fasten unit to floor starting in the
center of the base flange moving outward every 8 inches.
4
Mark fitting locations. (Refer to measurements from step 3.) Using a hole saw
(fine tooth or abrasive grit cutting edge), make necessary openings for filler and
valves, drilling from inside (smooth side) out.
6
Check for level.
8
Fasten panel to framing at every stud
and eight inches vertically through nailing flange.
Customer Service: 800-945-2726
— 3 —
InstallationData
Accessible Showers with Pre-leveled Base
1363BFSD/1363BFRF
Tabla de contenido
loading

Productos relacionados para Aquatic 1363BFSD

Este manual también es adecuado para:

1363bfrf

Tabla de contenido