Chapter 2. Transport And Installation - gala gar D-GPS Manual Técnico De Instrucciones

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

CHAPTER 2. TRANSPORT AND INSTALLATION.

Knocks and sudden movements must be avoided when transporting the equipment. The transport position
will be shown by arrows on the packaging. In any case, the packaging must be protected from water.
Assembly of wire feed wheels
2.1. ELECTRICAL SUPPLY INSTALLATION.
The electrical installation of the equipment making up the system must be carried out by specialised
personnel according to the applicable standards.
The location must fulfill the following conditions:
Place: Dry and ventilated. Far enough away from the welding area in order to prevent the metal dust
caused by the welding process from getting into the equipment. The equipment must not be used in the rain.
PLACE THE WELDING MACHINE ON A FIRM FLAT SURFACE.
IF EQUIPMENT OF THIS KIND TIPS OVER IT CAN HAVE VERY SERIOUS CONSEQUENCES.
The electrical connection of the wire-feed unit is carried out with an extension, which connects it to the GPS
power source. The different recommended possibilities are defined in table 2.
Use
Description
Cooling module WCS
Cooled
Cable set (Cooled)
Auto Cooled
Cable set (Not Cooled)
The general installation process is described in the GPS power source manual. Read this section carefully.
D-GPS.Wire Feeder
Installation of wire feed in the top part of the
equipment. Assembly of wire feed support
Table 2 – Extension cords.
5 mt
Ref. 65900000
64187150
Cable 50 mm2
64187100
Cable 50 mm2
10 mt
WCS-520
64187250
Cable 70 mm2
64187200
Cable 50 mm2
10
T
15 mt
WCS-520 HQ
Ref. 65981000
64187350
Cable 70 mm2
64187300
Cable 70 mm2
Tabla de contenido
loading

Tabla de contenido