Operating Components - Silvercrest SEKU 2000 A1 Instrucciones De Uso

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

Operating components

Operating components
NOTICE
The operating elements are on the front of the appliance, above right and behind the ventilation grille.
To operate them, fold the ventilation grille forward.
ON/OFF switch (Flames)
ON/OFF switch (Heating, level 1)
2
ON/OFF switch (Heating, level 2)
3
Temperature control (Thermostat)
4
Dimmer (for fl ame lamps)
5
SEKU 2000 A1
4
3
2
5
67
GB
MT
Tabla de contenido

Solución de problemas

loading

Tabla de contenido