5. HANDLING
Before proceeding with installation, ensure that the means used to move and/or elevate the
device is of sufficient capacity.
6. INSTALLATION
6.1. INTRODUCTION
The entire range is designed to be installed at floor level.
The installer must make sure that the floor is able to bear the weight of the equip-
ment to be installed.
Once the device has been fitted, the installer must connect it with the air duct, the mains
connection, both for the motors, and for the batteries, if applicable, by means of the ter-
minals in the terminal connection box and the connection with the hot water closed circuit
for the water battery, if applicable. The tube for evacuating condensates will be secured
according to the instructions in the corresponding section.
6.2. MAINTENANCE SPACE
The installer must provide unobstructed spaces, so as to be able to freely access the
equipment for maintenance.
MODEL
CADT-D/DI/DC 1000
CADT-D/DI/DC 2000
CADT-D/DI/DC 3000
CADT-D/DI/DC 4500
CADT-D/DI/DC 6000
A (mm)
B (mm)
600
1680
800
1680
1080
1680
1080
1850
1310
1850
11
C (mm)
D (mm)
700
700
700
800
800
800
800
800
800
800