Important Information
ATTENTION
Work on the 230 V power system may only be performed by qualified
electricians.
DIN-VDE standards and rules, as well as those contained in the EIB manual
of the ZVEI/ZVEH, must be adhered to.
The applicable safety requirements (e. g., accident prevention
regulations, "law governing technical equipment") must also be
adhered to when working on connected operating media and
installations.
installations, the relevant standards, guidelines, regulations and
provisions of that country have to be observed in which the
installation is to be erected and operated.
Please check in any case if these standards and regulations
!
permit polyphase operation. If polyphase operation is
permitted, such a wiring system requires an all-pole
disconnection of all load and control lines since there is a danger to life.
For the planning and projection of the ABB Powernet EIB devices in a ABB
Powernet EIB installation, detailed descriptions of application programs and
documents for planning support are available. You can request these documents
from ABB.
The manufacturer's database available from ABB is continuously updated and
contains the latest applications. Please refer to the Technical Manual for the
relevant descriptions. Should you not yet have the database and/or the Technical
Manual, you can request these free of charge.
Version 1.1 and onwards of the device are programmed with the
ETS or with Power-Project (min. Vers. 3.0).
When wiring the shutter/series actuator 6972 AG-102-500 (hereinafter referred to
For
the
planning
and
erection
GB
of
electrical