afriso PrimoSol 130-1 Manual De Instrucciones página 41

Equipo de bombeo solar
Ocultar thumbs Ver también para PrimoSol 130-1:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 88
5.1
Mounting the product
 Check the sealing surfaces for cleanliness and damage.
 Verify that all pipe ends are perpendicular and have been deburred.
The product is delivered ready to be installed. You must not dismount any of
the parts.
1. Remove the upper insulation.
2. Hold the product to the wall with the lower insulation, align it with a level
and draw two marks.
3. Drill a hole (Ø 10 mm) at each of the marked positions and insert the
enclosed dowels.
4. Screw the long hanger bolt into the top hole, the short hanger bolt into the
bottom hole.
5. Fit the product with the bottom insulation and secure it with a washer and
a nut.
6. Connect the pipes of the solar circuit to the connections of the fittings (see
chapter "Connecting the product").
7. Fit the upper insulation.
Fig. 5: PrimoSol® 130-1 (left)
Fig. 6: PrimoSol® 130-4 (right)
Mounting
PrimoSol® 130
EN
13
Tabla de contenido
loading

Productos relacionados para afriso PrimoSol 130-1

Este manual también es adecuado para:

Primosol 130-4

Tabla de contenido