Front End Parts Installation - ESAB MT-300GL Instrucciones De Operación

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

SECTION 3
3.4 – FRONT END PARTS INSTALLATION
3.4.1 INSULATOR NOZZLE AND CONTACT TIP
IMPORTANT
Shock washer must be in place before welding to maintain insulation of gooseneck armor.
Be sure all parts are tightened well before welding.
To prevent scoring of the tip adaptor, do not use pliers.
Removal and Replacement
Pull insulator nozzles off with a clockwise twisting motion.
When installing nozzle, exposed insulator should nest inside shock washer to assure concentricity.
Remove tip adaptor using 5/8" (16 mm) wrench
Shock washers are positioned on the end of the gooseneck with the insulated counterbore facing the nozzle.
Replace tip adaptor with deep counterbore toward the gooseneck. Tighten until retainer and shock washer are
secure.
Install contact tip and tighten using pliers. See chart below for corrent contact tip.
ESAB Contact Tips
Wire Type & Size
Hard, Cored & Soft Wires
.030 in. (0.8 mm)
.035 in. (0.9 mm)
.045 in. (1.2 mm)
.052 in. (1.4 mm)
1/16 in. (1.6 mm)
5/64 in. (2.0 mm)
3/32 in. (2.4 mm)
7/64 in. (2.8mm)
1/8 In. (3.1 m)
Note:
Contact Tips manufactured by ESAB, Tregaskiss and Lincoln can be used with this tip
adapter. Tip lengths will vary. Use of the tip insulator during welding is a customer
choice. Tip extension and/or recess from the tip insulator nozzle will vary depending on
the contact tip manufacturer and size chosen.
ContactTip
Part No.
Q403-1-30
Q403-1-35
17765
17778
948835
948832
948833
Q603-764
Q603-18
21
INSTALLATION
Inside Diameter
in. (mm)
.039 (.9)
.044(1)
.062 (1.6
.062 (1.6)
.072 (1.8)
.094 (2.4)
.123 (3.1)
.120 (3.2)
.144(3.6)
Tabla de contenido
loading

Este manual también es adecuado para:

Mt-400glMt-500gl

Tabla de contenido