Installing The Cable-Management Arm - Dell POWER EDGE 1950 Guia De Instalacion

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

Installing the Cable-Management Arm

NOTE:
You can attach the cable-management arm to either the right or left mounting rail, depending on how you
intend to route cables from the system.
1 If necessary, press the catch at the center of the cable-management arm retention latch on the tray,
and rotate the latch downwards (see Figure 1-12).
2 At the back of the system, fit the latch on the front end of the cable-management arm onto
the innermost bracket on the slide assembly, until the latch engages (see Figure 1-13).
3 Fit the latch on the unattached end of the cable-management arm onto the outermost bracket on
the slide assembly, until the latch engages (see Figure 1-13).
Figure 1-13. Installing the Cable-Management Arm
back of system
1
mounting rails (2)
4
cable-management arm
2
brackets (2)
3
1
2
3
4
latches (2)
Four-Post Rack Installation
23
Tabla de contenido
loading

Tabla de contenido