Sonnenkraft RLGHE Manual De Instrucciones página 20

Ocultar thumbs Ver también para RLGHE:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 50
Function of the gravity brakes
Opening pressure of the gravity brakes:
Solar flow:
20 mbar (optional)
Solar return: 40 mbar
The gravity brakes are integrated into the flow [19] and
return ball valves [1]. Actuate by turning the ball valve
handles.
Operating position:
To prevent the circulation of gravitational force, the valve
disc must not be cracked open. The gravity brakes are in
the operating position when the handles are vertical.
Draining/filling:
To fill and completely drain the solar energy system, open
the gravity brakes by turning the handles to the right.
The handles are at a 45° angle.
"Closed" position:
Turn the handles clockwise by 90°.
The ball valves are closed. The handles are in the hori-
zontal position.
20
GB
Tabla de contenido
loading

Este manual también es adecuado para:

131326

Tabla de contenido