Power; Hoist Connection; Commissioning; Installation Of Cables For Lifting - FIXATOR LM Serie Instrucciones De Uso

Cabrestantes eléctricos
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

A stop may still be placed on the loose strand to
serve as low end stopper.
In case of reeving, double the maximum load
to be taken into account for the calculations of
security.
NOTA : take care to mount the pulley block so that
its limit spring is located on the cable between the
pulley and the entry in the hoist (see figure).
Check the triggering of your travel limit
switch before use; a repositioning of the stoppers
may be necessary depending on the configuration of
job.
Check the capacity of the anchoring points.
When operating with the reeving system, especially
the operator will ensure that the load is not turning
on itself, to avoid tangling the three strands of the
cable (two strands loaded and the slack side).
INSTRUCTION MANUAL
Electrical winches LM+
Stop immediately if the loose strand comes to
tangle with the other strands.

2.1.5 Power

The installer must ensure that the power supply is
compatible with the specification of the winch.
upstream by a 30 mA differential switch. The
installation must be in accordance with EN 60204-
1. Power outlets must be calibrated to 20A.
The power cable to the LM control box must be
flexible cable (Class 5). Beyond 30m, it must be
held in place by a suitable anchorage clamp.
EXTENSION SECTION (mm²) at 110V
Type :
3 wires
P+N+T
EXTENSION SECTION (mm²) at 230V
Type :
3 wires
P+N+T
If the LM winch is powered by a generator, check
that it delivers at least the voltage and power
required at the start of the winch (min 6kVA).

2.1.5.1 Hoist connection

- Connect the button box to the socket on the
- Connect the main power plug.

2.1.5.2 Commissioning

movement of your hoist.

2.1.6 Installation of cables for lifting

rope.
The power supply must be protected
0-10m
10-20m
0-33'
33-65'
2.5²
4.0²
13AWG
11AWG
0-50m
50-80m
0-164'
164-263
2.5²
4.0²
13AWG
11AWG
winch.
- Unlock
the
necessary
- Press the UP button to lift or pull the
load
- Press the DOWN button to lower the
load
At any time, in case of imminent danger or
need, press the Punch red button to stop any
Use protective gloves when handling wire
Réf : 1813000204
Page : 8/20
Version : 46/18
20-30m
30-50m
65-100'
100-164
6.0²
10.0²
9AWG
7AWG
80-140m
140-
200m
6.0²
10.0²
9AWG
7AWG
emergency
stop
if

Hide quick links:

Tabla de contenido
loading

Este manual también es adecuado para:

Lm300sLm450Lm500461e461d461c

Tabla de contenido