Never disable the safety features.
Never swing a load voluntarily.
Do not block a control.
In case of continuous operation for more
than 30 ', the surface temperature of the motor can
begin to rise significantly.
2.8
Transportation, handling, storage
To transport your machine from one site to another,
remove the cables from your hoist.
Store the various components of your equipment in
a clean and dry place.
INSTRUCTION MANUAL
Electrical winches LM+
3 Maintenance - Settings
by personnel specially trained by the manufacturer
or its dealers.
3.1
LM hoists must be reviewed at least once a year and
every 100h. In harsh environments (sandblasting,
marine, back and forth operation at full load, doubts
about the proper use etc) a higher frequency of
verifications may be required.
Load lifting winches are intended for a limited
lifetime; beyond that, a return to factory is
imperative.
For the hoist LM+, the ranking is A2.
In some countries, periodic audits and reviews of
commissioning are mandatory.
3.1.1 Preventive maintenance
competent person trained by FIXATOR or its
dealers. The FIX022 manual details these annual or
control operations.
Check:
Daily :
The quality of your anchors and of the 2 hooks
(latch).
The good clamping of the travel end stoppers on
your cable.
The good general condition.
Monthly :
The proper functioning of the safety devices
(emergency stop, limit switches, brake).
The good condition of the wire rope (§3.1.3)
The overall proper functioning by performing a full
movement at the rated load.
Every year and every 100h :
Check the groove pulley.
Check the bearings, rudder, gear...
Check the motor brake.
Control each security (cf §2.2.2) at the rated load.
Clean and grease the gears (e.g. BIMO EP or
Klubersynth AG14-61)
Maintenance operations must be performed
Maintenance operations
These operations must be performed by a
Réf : 1813000204
Page : 12/20
Version : 46/18