Overhead Rigging - Briteq COB BLINDER 2X 100W Manual De Instrucciones

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

ENGLISH
DESCRIPTION:
1. BRACKET: with knobs on both sides to fasten the unit and a mounting hole to fix a mounting hook.
2. Mains input: equipped with a Neutrik Powercon mains input connector.
3. Mains output: equipped with a Neutrik Powercon mains output connector. You can use this output to
feed your next projectors. (TOTAL LOAD = MAX. 16A !!!)
4. Fuse holder: always replace a damaged fuse with a fuse of the same type and electrical specifications!
5. MODE (Menu) button: used to browse the different functions in the menu
6. ENTER button: used to confirm your choice or to enter the setup mode of a function.
7. UP button: to increase the values shown on the display.
8. DOWN button: to lower the values shown on the display.
9. DMX OUTPUT: use the 3pin or 5pin female XLR-connector to connect the projector with the next unit in
the DMX chain.
10. DMX INPUT: use the 3pin or 5pin female XLR-connector to connect the projector with the DMX
controller or with the previous unit in the DMX chain.
11. DISPLAY shows the various menus and the selected functions.

OVERHEAD RIGGING

• Important: The installation must be carried out by qualified service personal only. Improper
installation can result in serious injuries and/or damage to property. Overhead rigging requires
extensive experience! Working load limits should be respected, certified installation materials
should be used, the installed device should be inspected regularly for safety.
• Make sure the area below the installation place is free from unwanted persons during rigging, de-rigging
and servicing.
• The device should be installed out of reach of people and outside areas where persons may walk by or be
seated.
• Before rigging make sure that the installation area can hold a minimum point load of 10times the device's
weight.
• Always use a certified safety cable that can hold 12times the weight of the device when installing the unit.
This secondary safety attachment should be installed in a way that no part of the installation can drop
more than 20cm if the main attachment fails.
• The device should be well fixed; a free-swinging mounting is dangerous and may not be considered!
• Don't cover any ventilation openings as this may result in overheating.
• The operator has to make sure that the safety-relating and machine-technical installations are approved by
an expert before using them for the first time. The installations should be inspected every year by a skilled
person to be sure that safety is still optimal.
BRITEQ
®
3/44
USER MANUAL
COB BLINDER 2X100W
Tabla de contenido
loading

Tabla de contenido