INSTALLATION OF EQUIPMENT
BioQualyAir 40L
Voltage
127V~ ±10%
220V~ ±10%
BioQualyAir 65L
Voltage
127V~ ±10%
220V~ ±10%
Wiring Diameter (tread): For distance up to 5m from the circuit breaker until equipment
socket, wiring should be 2,5 mm ² section; from 5 to 15m, 4mm wiring; from 15 to 50m,
6mm wiring (According to standard ABNT NBR-0148, metric series PVC 70 °C).

OPERATION OF EQUIPMENT

Powering the BioQualyAir up

Turn the power switch (05) to position "AUTO".
The compressor will be turned on until the inner
pressure of the tank displayed on the gauge (06)
reachs 8.16 kgf / cm ² (0.8 MPa - 116 psi), on this
value the pressure switch will turn off the compressor
which will be powered again when the inner pressure
reaches of 5.71 Kgf/cm ² (0.56 MPa - 81,22 psi), and
so successively and automatically.
If the pressure switch fails, the safety valve (07)
will start running by releasing the excessive pressure.
Rated current
7,3 A
5 A
Rated current
14,6 A
10 A
32
Circuit breaker
10 A
10 A
Circuit breaker
20 A
16 A