Connecting The V-Belts; Conectando Las Bandas-V - HYTROL 138-ACC Manual De Instalacion Y Mantenimiento Con Informacion Sobre Seguridad Y Lista De Partes

Tabla de contenido
FIGURE 8A
Connecting the
V-Belts—ACC
The double groove sheave, located at one end of each con-
veyor section, is used to connect the driving V-belts of the
conveyor. The groove in which each belt is placed is pre-
determined at the factory. Refer to Figure 8B.
Beginning with the drive bed section, the drive V-belt is
installed in the outside groove of the sheave. From this
point on, (in both directions), the belts will alternate from
inside to outside groove. (Figure 9A).
Note that take-up sheaves have been installed to align the
V-Belt with the respective grooves on the double groove
sheaves. (See Figure 9B).
FIGURE 8B
8
"MATCH-MARK" NUMBERS
(ETIQUETAS DE ARMADO)
"A"
OUTSIDE GROOVE
(RANURA EXTERIOR)
ADJOINING CONVEYOR CHANNEL
(ESTRUCTURA DEL TRANS -
PORTADOR ADYACENTE)
DETAIL "A"
Conectando las
Bandas-V — ACC
La polea de doble ranura de la banda-V, que está ubicada
a un lado del transportador, se usa para conectar las ban -
das-V del transportador. La ranura en que se coloca cada
banda se determina en la fabricación. Vea la Figura 8B.
Empezando con la sección motriz, la banda-V se coloca en
la ranura exterior de la polea. Desde este lugar (en ambas
direcciones), las bandas se alternan de interior a exterior
(Figura 9A).
Verifique que las poleas tensoras hayan sido instaladas
para alinear la banda-V con sus respectivas ranuras en las
poleas de doble ranura. (Vea Figura 9B).
DOUBLE GROOVE SHEAVE
(POLEA DE DOBLE RANURA)
INSIDE GROOVE
(RANURA INTERIOR)
SPUR CHANNEL
(ESTRUCTURA DE ESPUELA)
"K" BRACKET
(SOPORTE "K")
Tabla de contenido
loading

Este manual también es adecuado para:

138-lrc138-lrs138-lrss

Tabla de contenido