General Installation and Transport Instructions
ing the solar panel system, familiarise yourself with the locally applicable standards and regulations. We recommend
that you use a carrying strap to transport the solar collector. You must not lift the solar collector by its connections
or screw threads. Do not jolt the collector or allow parts of it to be affected by mechanical factors. This is particularly
important for the glass, rear panel, and pipe connections.
Structural engineering aspects
load-bearing capacity of the roof or substructure must be checked in accordance with local and regional stipulations at
the site prior to the installation of the panels, if necessary by means of the commissioning of a structural engineer. In
ity of the screw connections for attaching the panel mounting apparatus. The on-site checking of the system (panels
to heavy snow or high winds. When doing this, you need also to investigate all the peculiarities of the erection location
(prevailing winds (foehn), venturi effects, eddies, etc.) that may lead to locally increased loading.
Information regarding inclined roofs (see on-roof installation):
vention in a (pre-existing) roof. Roof cladding such as tiles, shingle, and slate, attics with a special construction or that
are used for residential purposes, and roof pitches that are below the minimum recommended value require (in rela-
tion to the cladding) additional measures to be carried out by the customer in order to protect against the penetration
of water as a result of wind force and driving snow. This might include sub-roof membranes, for example. To prevent
characteristic snow load Sk > 1.25 kN/m². When selecting the installation site, note that the maximum permitted
situations) must not reach the solar panels. Snow catchers must be installed 0.5 m above the top of the panels to en-
sure that the panels themselves do not act as snow arrestors. To prevent inadmissible wind loads, the collectors may
not be installed at the edge of a roof (e/10 edge zones as per EN1991, but with a minimum gap of 1 m). In particular,
in the case of elevated structures, the top of a panel must not protrude above the roof ridge. Panels must not be in-
stalled below a height transition so that it is not possible for excess loads to fall onto the panel system from the higher
level as a result of drifting or sliding snow. If, to solve this problem, snow catchers are installed at the higher level, the
statics of the higher level must also be checked.
a (pre-existing) roof. Attics with a special construction or that are used for residential purposes and roof pitches that
are below the minimum recommended value require (in relation to the cladding) additional measures to be carried out
by the customer in order to protect against the penetration of water as a result of wind force and driving snow. This
might include sub-roof membranes, for example. When selecting the installation site, note that the maximum per-
mitted loads must not be exceeded as a result of snow or wind forces. To prevent inadmissible wind loads, the panels
must not be installed at the edge of a roof (e/10 edge zones as per EN 1991, but minimum gap of 1 m). Collectors
may not be installed below a height transition so that it is not possible for excess loads to fall onto the panel system
from the higher level as a result of drifting or sliding snow. If, to solve this problem, snow catchers are installed at
ballast blocks enables the system to be installed without penetrating the roof cladding. If the panels are mounted on
concrete ballast blocks, rubber underlays must be used to increase the static friction between the concrete ballast
blocks, thus preventing damage to the roof cladding.

Lightning protection

observed. A safety gap of at least 1 m from any adjacent conductive object is to be maintained. In the case of instal-
enable equipotential bonding of the building, the metallic conductor pipes of the solar circuit and all of the collector