Optional Installation - Pentair FRESHPOINT GRO-475B Manual De Instalación Y Operación

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

OPTIONAL INSTALLATION

Connecting your Reverse Osmosis System to Refrigerator Icemaker / Water Dispenser
If you are connecting this unit to your refrigerator/icemaker with initial RO installation, wait to turn on the icemaker
CAUTION
until the post-polishing filter has been flushed according to Step 11.
Use plastic tubing and fittings. Do not use copper tubing or brass fittings.
CAUTION
NOTE: For optimum performance, it is recommended that the distance between the RO system and the refrigerator icemaker/water
dispenser be no greater than 10 feet (3 m). At distances greater than 10 feet, the water pressure from the system may not be
adequate to deliver water to the refrigerator.
MATERIALS REQUIRED(available from your local hardware store):
• 3/8" x 3/8" x 3/8" (0.952 mm x 0.952 mm x 0.952 mm) compression or quick-connect tee
• 10 feet (3 m) of 3/8" (0.952 mm) polyethylene tubing
• Shut-off valve
1. Turn off refrigerator water supply and icemaker (consult manufacturer's guidelines).
2. Close tank valve (on top of storage tank).
3. Turn off water to RO system at the cold water supply, or at the feed water supply adapter.
4. Open drinking water faucet to relieve pressure.
5. Locate tubing (permeate) leading to your drinking water faucet. Cut and insert the
3/8" x 3/8" x 3/8" compression or quick-connect tee into the permeate tubing.
Consult manufacturer's guidelines before installing the supply adapter.
NOTE: When cutting the permeate tubing, you may experience some water leakage.
6. Using a length of 3/8" polyethylene tubing, connect the
icemaker/dispenser line with the free port on the compression tee.
7. The shut-off valve should be installed as close to this port of the tee
as possible. Shut-off valve should be installed in the OFF position
Consult manufacturer's guidelines before installing the shut-off valve.
8. Completely open cold water supply.
9. Open tank valve.
10. Turn off the drinking water faucet.
11. Turn on water to RO system at cold water supply.
12. Turn on icemaker and open shut-off valve.
Consult manufacturer's instructions.
13. Check for leaks and tighten connections if necessary.
3
2
FRESHPOINT GRO-475B/GRO-475M Installation and Operation Manual • 11
4
7
5
6
1
Tabla de contenido
loading

Este manual también es adecuado para:

Freshpoint gro-475m

Tabla de contenido