Every Day; Periodic Maintenance; Assembly Instructions - Chicago Pneumatic CP 0315 Instrucciones De Seguridad Y De Funcionamiento

Perforadora de muestras
Ocultar thumbs Ver también para CP 0315:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 56
Safety and operating instructions
After each service, check that the machine's
vibration level is normal and that the rotation
speed is correct. If not, contact your nearest
authorised workshop.

Every day

Before undertaking any maintenance or changing
the insertion tool on pneumatic machines, always
switch off the air supply and bleed the machine by
depressing the start and stop device. Then
disconnect the air hose from the machine.
Clean and inspect the machine and its functions
each day before the work commences.
Conduct a general inspection for leaks and
damage.
Check that the air inlet nipple is tightened and
that the claw coupling is free from damage.
Check the function of the throttle handle. Make
sure that it returns to its stop position when it is
released.
Change damaged parts immediately.
Replace worn components in good time.
Make sure that all the attached and related
equipment, such as hoses, water separators and
oilers are properly maintained.

Periodic maintenance

After each operating period of approximately 100
working hours or three times a year the machine
must be dismantled and all parts be cleaned and
checked. This work must be performed by authorized
staff, trained for this task.
16
www.CrowderSupply.com • Toll Free: 888-883-5144

Assembly instructions

Thin side of the outer race pointing in the
A.
direction of the arrow.
Torque: 6−7 lbf/ft (8−9 Nm)
B.
Torque: 6−7 lbf/ft (8−9 Nm)
C.
Torque: 6−7 lbf/ft (8−9 Nm)
D.
E.
With parts in place, the gear housing should
be approximately half filled with grease. Use
a good grade ball bearing grease. Do not
over-lubricate gearing, excessive grease will
cause overheating.
9800 0554 90a | Original instructions
CP 0315
Tabla de contenido
loading

Tabla de contenido