FIG. 12
Venturi assembly and check valve kit
8.1. Ozone generator
Check for voltage in the equipment, using electrical instruments. In this case the 1E indicator lights up (see Figure 6)
Check that the cooling fan is running when the 2E pushbuttons are set (see Figures 7A, 7B, 7C, 7D)
Check that the generation indicators are working. These should light up green when the green pushbuttons (ozone1 and
ozone2) are set.
Check for air suction when the system is running by placing the hand near the air inlet to the equipment (in).
Check that no water has entered the equipment. If so, dismount the ozone reactor and dry the various components
using an air dryer or leaving them in a dry, well-ventilated area for several hours until completely dry. To dry moisture in
the
cabinet
and
from
Chec k valve
D32 mm
Pipe PVC Glass
300 mm D 32
Injector 1"
By P ass
all
components,
wipe
16
From Oxsan Ozonizer
Chec k valve
D32 mm
W ater Level
W ater trap
the
inside
of
the
cabinet
Ref.: Ozone generator-AstralPool-gb-R11
with
a
cloth.