Installation and Framing Instructions
Each bath arrives ready for installation, completely equipped with the pump/blower electronics
and plumbing necessary for operation. However, a drain/overflow kit is required for each bath
and it is not included.
The variety of installations for this bath may require framing procedures other than those shown.
Locate studs as required. Ensure roughing-in dimensions are proper, plumb, and square.
!
Remove the bath from the carton. Retain the shipping carton until satisfactory
inspection of the product has been made. Do not lift the bath by the plumbing at
any time; handle by the shell only.
!
All bath units are factory tested for proper operation and watertight connections
prior to shipping. Prior to installation, the bath must be filled with water and
operated to check for leaks that may have resulted from shipping damage or
mishandling.
The sumps of these baths are supported by feet and no additional sump
!
support is required. Once the bath is in place, the feet should be shimmed and
secured accordingly so that the rim of the bath contacts the stringer or pier but
supports no weight.
Provisions must be made in all installations for an access opening for servicing the
!
bath pump/blower. Unless an access opening of at least 12" x 24" (305mm x 610mm)
is provided, warranty service will not be performed. It is strongly recommended that an
additional opening be provided for access to drain components.
!
Each bath has a nominal length (L), width (W), and Height (H) along with a rim
height. Unless otherwise noted in the following rough-in references, assume
that the nominal tolerances are as much as +/-1/4 inch (6mm). Therefore, it is
strongly recommended that the installer build the surrounding structure after
receiving the actual bath. Structural measurements should be verified against
the actual bath received to ensure proper fit.
POST INSTALLATION CLEAN-UP
Remove all construction debris from bath. Tile grout can be removed with a wooden
popsicle stick or tongue depressor.
Do not use wire brushes or any other metal implement on bath surface.
Post installation clean-up generally can be completed using warm water and liquid
dishwashing detergent.
Stubborn dirt or stains may be removed using granular Spic and Span
Painter's naphtha can be used to remove excess adhesives and/or wet oil-base paint.
4
®
mixed with water.
754532-100 Rev. 3 3/19