Technical Details - Vetus POWER HYDRAULICS HT1015 Instrucciones De Instalación

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 14
The oil level in the pump must be at or above the centre line of
the pump before taking it into service.
Handle as follows:
- Take off the hose which runs from the tank to the pump suc-
tion connection (Z) where it is connected to the tank
- Fill the hose with oil
- Refit the hose
- Now start the engine; let it run for about 30 seconds
- Now turn off the engine. The pump will now fill up. Wait 10
minutes.
- Now start the engine again. The hydraulic system is ready for
use.

4 Technical details

Type
Direction of rotation
3)
Suction and compression
connections
Suitable for
Connection flange
Capacity
Maximum number of revolutions
Standard set working pressure
Maximum possible working pressure
Maximum drain pressure
Maximum continuous
inlet temperature
Lowest working temperature
Weight
1)
PTO: 'Power Take Off', power axle for accessories
2)
See pages 20 - 27 for drawings.
3)
Direction of rotation seen from the side of the inward axle
4)
HT3012 – coupling with 13 teeth (16/32 pitch)
HT3023 – coupling pilot bored
POWER HYDRAULICS Hydraulic pumps
HT1015
anti-clockwise (CCW)
back of pump
PTO from
Vetus Deutz engines
Vetus Deutz engines
DT64, DTA64,
DT43, DTA43;
DT67, DTA67;
PTO from
PRM gearbox
PRM gearbox
SAE 'B-B' (2 bolts)
HT1016
HT1017
clockwise (CW)
sides of pump
PTO from
PTO from Twin Disc
gearbox
PTO from
0 to 45 cc
3000 rpm
215 bar
275 bar
2 bar
105°C
- 30°C
11.8 kg
ENGLISH
HT1022
anti-clockwise(CCW)
fitting in front
of the engine in
combination with
a flexible coupling
4)
SAE 'C' (4 bolts)
0 to 69 cc
2500 rpm
215 bar
310 bar
2 bar
105°C
- 30°C
35.4 kg
7
12.0102
Tabla de contenido
loading

Tabla de contenido