Start-Up; Test Operation; Indoor Unit; Outdoor Unit - DIAL 9K Manual Del Usuario

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation Instructions

Start-up

Test Operation

Perform test operation after completing gas leak and electrical safety check.
Turn on electrical power to outdoor unit.
Push the "ON/OFF" button on Remote Controller to begin testing.
Push MODE button, select COOLING, HEATING, FAN mode to confirm all functions.
System Checks
Conceal refrigerant pipes where possible.
Make sure drain hose slopes downward along entire length.
Ensure all refrigerant pipes and connections are properly insulated.
Fasten pipes to outside wall, when possible.
Seal and weatherproof wall-hole through which the interconnecting wires and refrigerant pipes pass.

Indoor Unit

Do all Remote controller's buttons function properly?
Do the display panel lights work properly?
Does the swing louver function properly?
Does the drain work?

Outdoor Unit

1. Push the mode button to COOL and adjust the room setting to 61°F(16°C) deg. wait up to 3 minutes from
compressor time guard. Does compressor and outdoor fan turn on in cooling mode?
2. Push the mode button to HEAT and adjust the room setting to 85°F (30°C) deg. wait up to 3 minutes for
compressor time guard. Does compressor and outdoor fan turn on in heat mode?
13

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

12k18k24k36k

Tabla de contenido