Installa On Guide - Gallagher MB1800i Manual De Instrucciones

Ocultar thumbs Ver también para MB1800i:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 55
Gallagher 3E4345 MB1800i MB2800i Energizer User Manual
INSTALLATION GUIDE
Step 1. Install the Energizer
Energizer must be installed under cover, where it
is protected from the environment. For further
installa on op ons refer to Mul Power Op ons
below.
Mount the energizer on a wall and out of reach of
children. Install where there is no risk of the energizer
incurring fi re or mechanical damage and if possible
away from heavy electrical equipment eg. pumps or other items
that may cause electrical interference.
a)
Using the template on the back page, drill 2 x 4mm
(5/32") holes (A & B).
b)
Fix the screws provided into the wall leaving the head
of the screw about 3mm (1/8") out from the wall.
c)
Place the energizer over and slide down onto the
moun ng screws.
d)
Remove orange terminal cover to expose Fence, Earth
and Reference Earth terminals.
Mul Power Op ons
Mains
Powered
Battery
Powered
a
b
Solar/ Battery
Powered
9
Tabla de contenido
loading

Este manual también es adecuado para:

Mb2800iMb1000

Tabla de contenido