Final Setup - GE Profile DPGT750 Manual De Instrucciones

Ocultar thumbs Ver también para Profile DPGT750:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

FINAL SETUP

LEVEL THE DRYER
1
Stand the dryer near the final location. Place
a level against the side and bottom of the
dryer door frame and use the four leveling
legs to level your dryer.
Raise
Lower
ATTACH SERIAL CABLE
2
Attach the serial cable for washer and dryer
connection to the serial port on the back of
the dryer.
Attach the other end of the cable to the
washer before pushing the washer into its
final position.
Installation Instructions
Rear of
Dryer
Serial
Port
PLUG DRYER IN
3
Ensure proper
ground exists
before use.
33

Capítulos

Tabla de contenido
loading

Tabla de contenido