- Additionally fasten the hood with 2
screws M8x16 and washers at the
bottom part of the hood to the support-
ing channel.
- Stick screws from the rear through the
corresponding holes of the supporting
channel and the hood and fasten them..
- Check drain pipe of the hood. the small
pipe must have a slope (this is necessa-
ry, that the condensated humidity inside
the hood can drain off) .
- If the pipe has no slope create one by
hitting the pipe with a hammer
(make sure that the pipe is not damaged
by doing this)
- Stick HT-pipe (item 7) over the drain
pipe of the hood.
- Close the top opening of the HT-pipe
with the lid (item 8)
- Close the supporting channel with the
cover panel (item 6) using the corres-
ponding screws.
- Connect HT-pipe to the drain system.
V 06
3. Electrical connection of the hood
Observe local regulations and standards
during installation
- The hood must be connected to a stand-
pic. 13
ard mains in accordance with the local
regulations. Before pulling the plug or
reconnecting to the power supply,
ensure that the UltraVent
off.
Observe colour coding of the wires.
Wrong connection can cause electric
pic. 14
shock
Wrong connection can cause damages (e.
g. pcb)
pic. 13/14
- Connect the hood to a standard plug
receptacle with 16 A fuse. The hood is
fitted with a cable approx. 5 m in length
with plug.
- The power connector of the hood must
be accessible otherwise an all-pole
disconnection device with a minimum of
3 mm contact gap must be used.
- In case the power cable must be
changed use a cable that matches your
local standards.
- Also on the top side of the hood there is
a stud for the earth connection. Fit the
hood with a suitable cable to the earth
bonding system
- 21 -
Attention:
Warning
Attention:
is switched
®
GB