AXIS Q8665–E PTZ Network Camera
1
2
1
Network cable
2
Power cable
3
Column bracket
4
Wall bracket
Attach the Base Unit to the Bracket
WARNING
The electrical connections and conduit installations shall be made by a certified electrician
and in compliance with local regulations.
1. Remove the desiccant bag, which is placed in the base unit.
2. Make sure the seal is in position.
3. Route the power and network cables through the base unit.
4. Connect the cables to the cable glands.
NO TICE
TICE
NO
NO
TICE
To maintain the product's IP rating and reduce cable strain, make sure to tighten the
cable gland caps.
5. To prevent the cables from slipping out, tighten the glands after you have pulled the
cable through them.
16