D-Link DFL-2560 Guia De Instalacion página 4

Ocultar thumbs Ver también para DFL-2560:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

LCD Keypad Controls After Boot-up
Next Button
Back Button
Figure 5. Button Definitions (After Boot-up)
Once the DFL-2560/2560G has completed its
system startup routine, the LCD panel will be
ready to display the device status information.
You can use the keypad to select a desired
display option. The following table lists the
status information that can be displayed on the
firewall's LCD panel.
Item
Description
Model Name:
Device model name
System Status:
System function status
CPU Load:
CPU utilization and concurrent
Connections:
sessions
Total BPS:
Concurrent traffic per second
Total PPS:
Concurrent packets per second
Date:
Current device date
Time:
Current device time
Uptime:
The amount of time since last
restart
Mem:
System memory utilization
IDS Sigs:
IDS signature information
Interface Name:
IP address for each interface
(See Table 4.)
Core Version:
Current firmware version
CPU Temp.
CPU and system temperature via
System Temp.
on board sensor
Fan Status
Fan speed
Table 4. Device Status Shown on LCD Panel
4  D-Link NetDefend Firewall
Installing and Connection
This chapter describes how to install a
DFL-2560/DFL-2560G device in a standard
19-inch equipment rack and how to connect
network and power cables to the device.
Before You Begin
Observe the following precautions to help
prevent faults, equipment failures and injuries:
-
Before installation, always disconnect the
power supply.
-
Ensure that the room in which you operate
the device has adequate air circulation and
that the room temperature does not exceed
40˚C (104˚F).
-
Allow 1 meter (3 feet) of clear space from the
front and back of the device.
-
Do not place the device in an equipment rack
frame that blocks the air vents on the sides of
the chassis. Ensure that enclosed racks have
fans and vented sides.
-
Correct any of the following hazardous
conditions before any installation: moist or
wet floors, leaks, ungrounded/frayed power
cables, or missing safety grounds.
Installing Equipment
You can mount the DFL-2560/DFL-2560G
device into a standard 19-inch equipment rack.
To install an DFL-2560/DFL-2560G device into
a rack:
1. Attach the mounting brackets to each side
of the chassis as shown in figure 6 and
secure them with the provided screws.
Figure 6. Attaching Rack Mount Brackets
Tabla de contenido
loading

Este manual también es adecuado para:

Dfl-2560g

Tabla de contenido