GEA JP989 Manual Del Propietario E Instrucciones De Instalación página 24

Estufa radiante de ventilación descendente
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

ATTACHING A BLOWER
14
TRANSITION DUCT
Use a blower transition duct for all downward
duct installations to connect to 6" round
standard ductwork. This 3
to 6" round transition duct is available at
your local building supply store.
Screws
Remove the cardboard packing in the blower
outlet.
Install the transition duct to the blower outlet.
Secure all joints with duct tape to assure an
airtight seal.
CONNECTING THE DUCTWORK
15
Connect the ductwork prepared in Steps 5 and
6 to the blower transition duct.
Installation Instructions
INSTALLING THE COOKTOP
" x 10" rectangle
1
4
Screw
(on other
side)
BLOWER ELECTRICAL
16
CONNECTIONS
• Loosen the screws and remove and discard
the sheet metal strap covering the 5-pin
connector. Save the screws for reinstallation
later.
• Connect the 5-pin plug on the blower
assembly to the matching 5-pin receptacle
on the bottom of the wire enclosure.
• Fold all wires into the electrical enclosure.
Secure the enclosure with the screws
removed earlier, making sure that no
wires are trapped
24
5-pin
connectors
.
5-pin
connectors
Electrical
enclosure
Flexible
conduit

Capítulos

Tabla de contenido
loading

Tabla de contenido