Installation
Installation
Installation
Installation
Installation
The EIB Delta-Meters are suitable for installation in distribution boards or
small enclosures, for wall mounting or panel mounting. They can be
snapped onto 35 mm mounting rails, according to DIN EN 60 715.
Tools
The following tools are required for installation.
Protection Class
Installation requirements
To comply with the protection requirements the meter must be mounted in
a class IP 51 enclosure or better, according to IEC 60529. Meters with
optional upper I/O connections situated on top of the device must be
mounted inside an enclosure of at least IP 20 to comply with
IEC 61000-4-2.
Tools
T25 Torx or flat blade screwdriver
No. 1 Pozidrive screwdriver (trans-
former-rated meters only)
2-3 mm flat blade screwdriver
(for pulse output and tariffs)
43