Preparing For Piling The Stones - Helo 1102-70-040517 Manual De Instrucciones

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 83
8
Installations- und Benutzerhandbuch Rocher DES

2.12. Preparing for piling the stones

Removing of the supporting bars to pile the stones
Unscrew the bars' mounting screws (2 pcs).
Lift the support bar's locking plate up from its
normal position.
Lift off the support bars.
Pile stones up to the Helo marker.
Reinstall the support bars.
Install the support bars as above in the reversed order.
Pile the stones so that they cover the heating elements.
For specific instructions refer to section 2.6 Sauna heater stones.
Bild 3 Preparing for piling the stones
Tabla de contenido
loading

Este manual también es adecuado para:

1102-105-040517

Tabla de contenido