Service Notes - Broan SPK110 Manual De Instrucciones

Ventilador del altavoz
Ocultar thumbs Ver también para SPK110:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

3. Snap damper /
d u c t c o n n e c -
tor onto housing.
Make sure con-
nector is flush with
top of housing and
damper flap falls
closed.
CONNECT WIRING
1. Run 120 VAC house wiring to installation location. Use proper
UL approved connector to secure house wiring to wiring plate.
Connect wires as shown in wiring diagrams.
FINISH CEILING & INSTALL GRILLE
BEFORE FINISHING CEILING:
To avoid motor bearing damage, noisy and/or unbalanced
impellers, or speaker damage - you may want to cover
the housing opening - to keep drywall spray, construction dust, etc.
off power unit and speaker diaphrams.
1. Install ceiling
material. Cut out
around housing.
2. Squeeze grille
springs and insert
them into slots
on each side of
housing.

SERVICE NOTES

To remove Blower Assembly:
Remove speaker assembly. Unplug motor. Remove thumbscrew
(10) from motor plate flange Find the single TAB on the motor
plate (located next to the receptacle). Push up near motor plate
tab while pushing out on side of housing. Or insert a straight-
blade screwdriver into slot in housing (next to tab) and twist
screwdriver.
SPEAKER
4. Connect 4-inch round
ductwork to damper /
duct connector. Run
ductwork to a roof cap
or wall cap. Tape all
ductwork connections to
make them secure and
air tight.
3. Push grille against
ceiling.
4. Turn on power to fan.
5. Go to Bluetooth
Speaker Operation section for Bluetooth
®
speaker operating instructions.
To remove Speaker Assembly:
Unplug motor from speaker wiring. Unplug speaker wiring from
wire panel. Remove (2) screws from speaker bracket. Unhook
speaker bracket from motor bracket and remove speaker.
MODEL SPK110
Page 4
®
Tabla de contenido
loading

Tabla de contenido