Mechanical Installation; Mount The Panel - Hach CLF10sc Manual De Usuario

Ocultar thumbs Ver también para CLF10sc:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 44
• Make sure that all chemical reactions are complete.

4.3 Mechanical installation

4.3.1 Mount the panel

Figure 5
shows the mounting dimensions. Refer to the figure and follow the steps to mount the panel.
1. Attach mounting screws to the mounting surface. Mount on wall studs or use wall anchors. Leave
enough room between the head of each screw and the mounting surface so the panel will fit in
between.
2. Slide the panel mounting holes over the heads of the mounting screws and allow the panel to
slide down until the top of each mounting hole rests on the screw body.
3. Tighten each screw to secure the panel to the mounting surface.
4. Install the chlorine and pH sensor (optional) in the flow cells. For information on how to install a
sensors, refer to the sensor user manual.
Figure 5 Reagentless chlorine analyzer panel dimensions
10 English
Tabla de contenido
loading

Este manual también es adecuado para:

Clt10sc

Tabla de contenido